2 x 150 MW ZONGULDAK / TURKEY
 Boiler erection
Boiler erection
High/low pressure proses piping fabrication and installation 
Off-site piping fabrication and installation
Steel structure fabrication and installation
Electrofilters and dust precipitators fabrication and installation
Civil works
Rotary equipment erection
Electrical works and instrumentation 
Equipment installation
Fabrications and installations in the machine hail
Fabrication, supply and installation of mud scrappers tor raw water intake pools
CATALAGZI THERMAL POWER PLANT SLUDGE DEWATERING AND COAL MIXING-WASHERY PLANT WITH LONG DISTANCE BELT CONVEYOR
363560 m, 400 tons/h CATALAGZI/ ZONGULDAK / TURKEY
 Length 3560 m
Length 3560 m
3560 m, 400 tons/hour
Steel structure fabrication and installation 
Rotary equipment erection
lnstrumentation
Medium-Tensile and Low-Tensile (MV/LV)electrical installation works 
Equipment erection
Commissioning